A terminal schedule of dilapidations arrives, with a figure that can run to six or seven figures, and a short deadline to respond. For many tenants it is the first time they have seen one. The important thing to know is that a landlord's schedule is an opening position, not a bill. Most are negotiable, and many are overstated.
Note every date on the schedule and any covering letter. The Dilapidations Protocol (the pre-action protocol for claims relating to the physical state of commercial property at the end of a tenancy) sets timescales for each stage, and a late or missing response weakens your position. Acknowledge receipt promptly, but do not accept liability or agree a figure until the schedule has been checked.
Your liability comes from the lease, not from what the landlord would like the building to look like. Check the repairing covenant, the decorating covenant, the reinstatement and alterations provisions, and whether the lease limits your repair obligation by reference to a schedule of condition taken at the start. If one exists, it can reduce what you owe significantly.
A surveyor will walk the property against the schedule and ask, item by item:
Cut edge corrosion, roof coatings and cladding items on industrial buildings are common areas where the specification and cost are overstated.
Even where a breach is proved, a landlord cannot always recover the full cost of the works. The law limits damages to the loss in value of the landlord's interest in the building, and in some cases removes the claim altogether. This is covered in our guide to Section 18 and diminution in value.
Landlords sometimes claim both the cost of works and rent for the period the works would take, or claim for items already covered elsewhere in the schedule. Each head of claim should be justified separately.
A clear, evidenced response, prepared by a surveyor, with each item accepted, rejected or part-accepted and reasons given, is what moves a negotiation. Our guide to the schedule of dilapidations and Scott schedule responses explains the format. Most claims settle through negotiation, and a reasoned position early on usually produces a better outcome than a late, general denial.
If the claim is above a few thousand pounds, if the lease is complex, or if the building is large or industrial, independent advice usually pays for itself. Our tenant dilapidations team acts for tenants across the UK, and the sooner we are involved, the more options you keep open.
The Dilapidations Protocol sets timescales for each stage, generally measured in weeks. Check the dates on the document you received and take advice quickly.
Often yes in principle, but the amount recoverable is limited by the loss in value to the landlord's interest, so a claim for works that will never be done is frequently reduced.
No. Acting before lease end, through a schedule of condition, a pre-termination survey or a break clause review, usually gives the strongest position. See our lease end checklist.
This guide is general information, not legal advice. Where a claim raises legal questions, take advice from a solicitor alongside your surveyor.